Soil log and site evaluation
Test pits, profile description, water table and restrictive layer depth, and a determination of what the parcel can support.
Before a system can be permitted, someone has to establish what the ground will accept. In Pierce County, where soils change over short distances, this step decides more about the final cost than any other.
Your request goes straight to an on-site sewage professional certified by the Tacoma-Pierce County Health Department and serving Pierce County, usually within about an hour during the day, not a national lead list.
Prefer to talk? Call (253) 367-7679.
A site evaluation logs the soil profile, depth to any restrictive layer, depth to the water table, slope, and the setbacks that apply to the parcel from wells, structures, boundaries and surface water.
A designer then produces the system drawing the Health Department reviews. On straightforward ground the design is routine; on difficult ground it is engineering.
The output is a document. Everything after it, permit, installation, inspection, follows from what the evaluation found.
The Puget lobe and Mount Rainier between them gave Pierce County outwash, till, lahar sediment and near-surface bedrock, sometimes within a couple of miles of each other. Regional rules of thumb are unreliable here in a way they are not in flatter, more uniform counties.
Parcels on the Graham and Roy prairies often log fast-draining gravel and support conventional designs. Parcels on the Gig Harbor peninsula and the Bonney Lake plateau frequently log till and do not.
Valley parcels in Puyallup, Sumner and Orting log fine sediment with a shallow water table, which restricts depth and often forces a mound or pressure design.
Test pits, profile description, water table and restrictive layer depth, and a determination of what the parcel can support.
A full design for an unbuilt parcel or a replacement, drawn to the standard the Health Department reviews against.
A design for replacing a failed component or absorption area on an existing system, working within what the parcel still has available.
An evaluation before buying undeveloped land, establishing whether the parcel can carry a system at all and roughly what type.
We do not publish a price, because a number quoted without seeing the property is a guess and you would be right to distrust it. What we can tell you is what moves the figure, so you know what a company is looking at when they price the job.
A real number comes from a site visit by a certified company. If two quotes differ a lot, the usual reason is one of the items above, and it is fair to ask which.
A replacement still has to be designed for current standards and for the area actually available now, which may differ from what existed when the original was installed. The old as-built informs the work but does not substitute for it.
It can. Shallow bedrock, very high water table, insufficient area or setback conflicts can all rule out a conventional system, and sometimes the answer is an engineered design that costs considerably more.
Where the seasonal high water table is the controlling factor, wetter months give the more conservative reading. Ask the designer whether timing matters on your parcel.
Yes, if the parcel will need an on-site system. A feasibility evaluation before purchase is much cheaper than discovering after closing that the land cannot carry a system you can afford.
No price is published on this site, and that is the same discipline every other claim here follows. Every regulatory statement on these pages traces to a cited rule with the date it was read. A cost range has no equivalent source, so rather than assert one, this site describes what actually drives the number.
For an inspection or a pump-out: whether the tank lids are already exposed or have to be located and dug out, the system type, since a proprietary treatment unit takes far longer than a tank and gravity drainfield, whether a pump is needed at the same visit, and travel, which matters at the county edges because Eatonville, Roy, Wilkeson and Carbonado are a long way from the companies clustered nearer Tacoma. For a repair or a replacement: whether the ground supports a conventional drainfield or forces a mound, pressure or treatment system, which is the difference between two very different projects.
The company that comes out prices it after seeing the system, and season matters too, since spring and summer are the busy listing months here. Booking outside the spring and summer listing rush, and having the lids located before the visit, are the two things within your control that move a quote.
Calls and form submissions reach Compass Camper LLC directly. We read the request and pass it to an independent local septic company certified by the Tacoma-Pierce County Health Department, usually within about an hour during the day. That company then contacts you to look at the system and price the work on their own schedule.
Septic inspection, tank pumping, operation and maintenance, drainfield repair and replacement, system installation, design and site evaluation, and records lookup. See every service.
Only the certified company we send your request to can price your actual system. Compass Camper LLC does not perform septic work and does not quote it.
Your request goes straight to an on-site sewage professional certified by the Tacoma-Pierce County Health Department and serving Pierce County, usually within about an hour during the day, not a national lead list.
Prefer to talk? Call (253) 367-7679.